Transmashholding (TMH) has estimated the effect of Production System (TPSys) deployment in 2016 and reached the conclusion that the measure proved its effectiveness. The company extimated the material economic effect of the TPSys in 2016 to RUB 140 million (2.1 million euros).
Transmashholding started TPSys deployment at its sites in 2009, being a pioneer of the process among Russian railway manufacturers. At present TPSys is being deployed at twelve sites of the company. This deployment enables Transmashholding’s sites to improve company performance, quality of products, and to reduce time waste. Currently 99% of the company’s staff successfully apply TPSys principles in their work. Almost all production areas at the largest TMH sites are covered with pilot areas where Production System is fully deployed.
Share on: