London Trackwork Inc. announced that it has been awarded the supply contract for the Special Trackwork for the Valley Line LRT in Edmonton, Alberta, Canada. The contract is to be completed within maximum 2 years.
The contract includes Number 6 & 8 geometry turnouts with single & double crossovers on the mainline.
Construction of stage one of the Valley Line LRT will connect Mill Woods to downtown Edmonton with about 13 km of light rail transit. This stage includes 11 stops, an elevated station incorporating a transit centre and Park & Ride, and a transfer point to the existing LRT at Churchill Square.
Pre-construction work began in March 2016 and is expected to be operational in 2020.
Share on: