Strukton LLC, in partnership with Wagner Solar, has been granted a contract for the installation of 4284 solar panels on the roof of the Riyadh Metro Depot Line 4/6. The solar panels are expected to produce 2452 MWh/a. The contract value amounts to USD 3.8 million. The client is Samsung C&T, which is responsible for the MEP works of Line 4 of the FAST consortium.
In line with Vision 2030, the national programme of the Kingdom of Saudi Arabia which is aimed at transforming and diversifying the economy, renewable energy plays a vital role in achieving the goals of the sustainability agenda. In this respect, this project provides Strukton LLC with the required references to enter into this growing market.
Share on:



