Russian railway engineering company RZD International has completed the reconstruction of the Vranjska Banja-Ristovac railway section of the Trans-European transport Corridor X in Serbia.
The project included the full rehabilitation of more than 17 km of track line, laying of seven switches, reconstruction of eight road crossings and two railway stations and low platforms, drainage system works, rehabilitation of signalling and telecommunication systems. After the reconstruction, the maximum speed of traffic, which previously did not exceed 50 km per hour, can be raised up to 120 km per hour.
The rehabilitation of the third section, Vinarci-Djordjevo, is on schedule, according to RZD International. The total cost of the project of reconstruction of the three sections is $38 million.