Bombardier Transportation first Innovia automated people mover (APM) 300 vehicle to the city of Shanghai. The first of its type in China, the vehicle is from an order placed in June 2015 by Shanghai Shentong Metro Group Co. Ltd. for a turnkey APM system along with 44 INNOVIA APM 300 vehicles.
The system will enter service later this year on Shanghai Metro’s Line 8 Phase 3 Project, a new 6.6 km, dual-lane elevated, driverless APM system that will connect the large residential district of Pujiangzhen to the Line 8 interchange at the Shendu Highway Station.
Share on: