Ansaldo STS and RATP signed a five-year contract for the preventive and corrective 24/7 maintenance of the signalling systems and equipment, interlocking equipment, and supervision systems. The contract covers 9 metro lines and 8 tramway lines totalling 404 stations and approximately 220 km.
Share on:



