RZD International has completed the reconstruction of the Vinarci-Djordjevo railway section, part of the Trans-European transport Corridor X, ahead of schedule. Reconstruction works on the railway section were performed together with Serbian subcontractors.
The project included the full rehabilitation of more than 15 km of track line, laying of eight switches, reconstruction of 11 road crossings, main tracks at the Leskovac and Djordjevo stations and 350 m of low platforms, drainage system works, as well as rehabilitation of signalling and telecommunications systems. After the reconstruction, the maximum travel speed on the section, which previously did not exceed 50 km/h, can be raised up to 120 km/h.
Share on: