The first modernized locomotive ET41 was put into operation at the Rolling Stock Repair Workshops of PKP Cargotabor in Ostrów Wlkp. The main objective of the modernization works was to create the best possible working conditions for the driver, by completely redesign the driver’s cab. By the end of this year the workshop will modernize another 6 locomotives of this series.
The locomotive ET41-006 underwent repair at P5 level, which is the highest level of maintenance with modernization of some elements of the vehicle. All items of the electric section of the locomotive have been replaced, including replacement of electrical installation; the pneumatic system was being rebuilt, bogies and traction motors were modernized.
According to PKP Cargo, the first reviews from using of the upgraded locomotive expressed by the drivers are very positive. By the end of this year, another 6 popular “Dachshunds” are to be upgraded that are intended to drive heavy freight cars.
Share on: