NAT to start implementing the third phase of Cairo Metro Line 3

Cairo metrou-Linia3_3-Cairo-metroNational Authority for Tunnels (NAT) to start implementing the third phase of Egypt’s Cairo Metro Line 3 next October, Chairman Ismail El-Nagdy announced to local media.
The route of phase three extends from El-Attaba to Rod El-Farag corridor, passing through Al-Kit Kaat up to Cairo Unversity station of line 2 with a total length of 18 Km, it comprises 14 stations.
The chairman stated that the third phase includes three parts: part one extends from Attaba to Al-Kit Kat with a total length of 4 Km, it comprises three tunnel stations (Naser – Maspyro – Al-Kit Kat) .
The second part extends from Al-Kit Kat to Rod EL-Farag station, passing through Embaba area , with a total length of 6.6 km, this part comprises 6 stations; one tunnel station, one surface station and 4 elevated station.
The six stations are: Al-Sudan – Embaba – El-Bohy – El-Qawmya El-Arabia – Ring Road – Rod El-Farag.

Photo: http://www.tunneltalk.com


Share on:
Facebooktwitterlinkedinmail

 

RECOMMENDED EVENT: